in

Prestressed concrete bridge: Agra Bridge: Leipzig renews call for for tunnel

Source link : https://bq3anews.com/prestressed-concrete-bridge-agra-bridge-leipzig-renews-call-for-for-tunnel/

Leipzig and Markleberg are renewing their request for a tunnel to exchange the bridge in Agra, which needs to be demolished because of critical injury. Town of Leipzig introduced that the development of the bridge will at once have an effect on the aforementioned Agra Park, during which the bridge passes. “We are missing a big opportunity if we repeat the mistake of the 1970s and cut Agra Park again,” mentioned Mayor Burkhard Jung (SPD).

Information

Infrastructure: Billions of Euros had to renovate German waterways ZEITmagazine clock treasure hunt: Clocks from the sector Z+ (content material matter to subscription); Risks of navigation programs: The navigation machine says, this is the best way!

“The fact that the tunnel option has been planned with little emphasis by the Free State in recent years is now paying off. You are now under time pressure.”

Kraushaar: It’s not that i am liable for the tunnel

Infrastructure Minister Regina Kraushaar (CDU) spoke out in opposition to the tunnel answer on Monday. She mentioned it was once no longer accountable in its place for the bridge. The sort of challenge is technically complicated and will last as long as two decades.

In step with Kraushar, a alternative bridge is the one answer that may be carried out briefly, is legally possible, financed and cheap for the area. The State Workplace of Highway Building and Transportation was once tasked with in an instant beginning making…

—-

Author : bq3anews

Publish date : 2025-11-18 16:41:00

Copyright for syndicated content belongs to the linked Source.

—-

12345678

How Milwaukee’s Silly Sausages Turned into a Beloved Baseball Tradition

After 7 Months, Spurs Celebrate the Triumphant Return of Tenacious Leader De’Aaron Fox